Detailed analysis of captured phishing page
Used to detect similar phishing pages based on HTML content
| Algorithm | Hash Value |
|---|---|
|
CONTENT
TLSH
|
T1B142557A411C113693B35EABB520639EF6BBF66DCF3B04452BFC87944BE8E9A9C44500 |
|
CONTENT
ssdeep
|
192:sS6+TQTpQNiCq8M51dFIpByRcRsw2x0lLnCfJCVxwudJJMocfk7y7:sv2QTqQJC/JM9cU |
Used to detect visually similar phishing pages based on screenshots
| Algorithm | Hash Value |
|---|---|
|
VISUAL
pHash
|
d2f20d2d3d9292e3 |
|
VISUAL
aHash
|
0064ecf440183c7e |
|
VISUAL
dHash
|
328d8d8d8472d4d4 |
|
VISUAL
wHash
|
00f4fcf4c0187e7e |
|
VISUAL
colorHash
|
38006000080 |
|
VISUAL
cropResistant
|
328d8d8d8472d4d4 |
Victim enters username and password into fake login form. Credentials are captured via JavaScript and exfiltrated to attacker's server in real-time.
Malicious code is obfuscated using 118 techniques to evade detection by security scanners and make reverse engineering more difficult.
Drainer checks balances of popular ERC-20 tokens (USDT, USDC, DAI, etc.) and only proceeds if total value exceeds minimum threshold.
Pages with identical visual appearance (based on perceptual hash)
Found 1 other scan for this domain